AI Infrastructure SimCity
Every data center that exists or is coming, what it will cost and emit, whether it should be built, and a simulation to build it in.
Research agents keep a registry of current and announced facilities from public sources. An estimation engine turns each one into economics, environmental footprint and community impact. An advisor searches energy mixes, issues a go, conditional or no-go verdict, and writes a build plan you can play through in the simulation.
Sites tracked
27
29,600 MW at full build-out
Operational
10
11,600 MW
In pipeline
17
18,000 MW
Verdicts
32 / 50 / 21
go / conditional / no go
For the
Executive
Where to build next, what it costs, how long until first revenue, and which sites the advisor would not sign off on.
- · Portfolio capex and payback
- · Critical path by site
- · Open conditions
For the
Policy maker
What each facility does to the grid, the water table, the air, and the local economy, and whether the operator has a viable path.
- · Jobs, tax base, local spend
- · Carbon, water, grid share
- · Nuisance and sentiment
For the
Investor
Risk-adjusted ranking of the pipeline with live sensitivity to power prices and utilization, and the verdict behind each number.
- · IRR, NPV, payback
- · Price and utilization sliders
- · Go / no-go with conditions
Recently updated sites
All sites| Site | Status | MW | Capex | Verdict |
|---|---|---|---|---|
| Stargate Abilene Abilene, Texas, United States | Under construction | 1,200 | $40.6B | Go |
| Colossus Memphis, Tennessee, United States | Operational | 300 | $10.0B | Conditional |
| Hyperion Richland Parish, Louisiana, United States | Under construction | 2,000 | $67.9B | Go |
| Prometheus New Albany, Ohio, United States | Under construction | 1,000 | $33.5B | Conditional |
| Project Rainier New Carlisle, Indiana, United States | Operational | 2,200 | $73.0B | Conditional |
| Fairwater Mount Pleasant, Wisconsin, United States | Under construction | 900 | $30.9B | Conditional |
| Loudoun County cluster Ashburn, Virginia, United States | Operational | 5,000 | $172.1B | No go |
| Council Bluffs Council Bluffs, Iowa, United States | Operational | 700 | $23.8B | Conditional |
How a verdict is produced
- 1Discover. Kimi plans web searches, Tavily runs them, and the model extracts name, operator, location, status, capacity, energy supply and sources.
- 2Enrich. The same pair establishes the local factors: power price, grid carbon and headroom, interconnection lead time, labor, land, water stress, nearby population, sentiment and any moratorium.
- 3Estimate. A deterministic engine computes capex, schedule, revenue, carbon, water, grid share, jobs, tax base and nuisance for a hardware spec and an energy mix. Change the mix and it recomputes.
- 4Advise. The engine searches alternative mixes against hard floors and fixes the verdict. GLM 5.3 writes the rationale, conditions, risks, a brief per audience, and a build plan that opens in the simulation.