Fairwater
AI datacenter on the former Foxconn site.
Supply as reported: Grid with utility solar expansion
The verdict is conditional, not a go as proposed: the 65% grid and 35% solar proposal scores 30 on environment against a 45 floor and draws 110% of regional grid headroom against a 60% ceiling, so it cannot proceed in that form. The search found one viable alternative, the SMR long-term mix of 70% nuclear and 30% grid, which lifts the environment score to 51, the composite to 63 and the community score to 73, with an 11% IRR and payback inside 4 years. That configuration also cuts annual emissions from about 1.8 Mt to about 0.9 Mt and reduces the grid draw to 51% of headroom, though rate impacts remain likely. Economics stay demanding at roughly $31B of capex for the proposed build, 504,000 GPUs and about $8.6B a year of revenue at 61% utilization. The conditions below therefore lock in the SMR mix, the land, the grid agreement and the community commitments before and during the phased build.
- Adopt the viable SMR long-term supply mix — 70% nuclear and 30% grid — in place of the proposed 65% grid and 35% solar mix, lifting the environment score from 30 to 51, above the 45 floor, and cutting emissions from about 1.8 Mt a year to about 0.9 Mt a year.
- Assemble land beyond the 41 ha measured open on site to the 167 ha the SMR configuration needs, with permitting and a signed community agreement completed before land close.
- Secure firm SMR licensing, procurement and delivery commitments before racks are energized in any phase, so no hall defaults back to majority high-carbon grid supply.
- Lock a grid interconnection and tariff agreement for the reduced grid share, which still draws 51% of regional headroom, with protections against rate impacts for other customers.
- Hold the community score above the 40 floor — the SMR configuration is scored at 73 — by funding and publishing the community measures in the plan for the life of construction.
- SMR licensing or delivery slips beyond the roughly 42-month, six-phase schedule, leaving halls built but unable to energize on low-carbon supply.
- Only 41 ha of open land is measured on site against 167 ha needed for the viable configuration, so land assembly could delay or shrink the project.
- Even at 51% of regional headroom, the grid share may raise rates for other customers and attract disclosure and regulatory scrutiny, especially if any fallback to grid-heavy supply occurs.
- Capital intensity is high at about $31B with roughly negative $1B of ten-year NPV on the proposal's assumptions, leaving returns sensitive to utilization, GPU-hour price decay and the year-5 GPU refresh.
- Construction at a 2,500-person peak crew brings noise and traffic pressure, and any failure on local hiring, water offsets or published limits could erode the community score toward its 40 floor.
- Annual water use of about 11 million cubic metres and residual emissions of about 0.9 Mt a year will face ongoing public and disclosure scrutiny.
| Supply mix | 70% small · 30% grid |
| IT load | 720 MW |
| Hardware | B200 · 80 kW racks |
| Crew · automation | 2,500 · 20% |
| Plan scores | 63 · E 67 · Env 51 · C 73 |
| Live in · payback | 42 mo · 3.7 yrs |
| Clears the floors | yes |
- Permitting and community agreement before land close, including assembly of land beyond the 41 ha measured open toward the 167 ha required.
- SMR licensing and on-site supply procurement, plus the grid interconnection and tariff agreement, in parallel with civil works and gated before rack energization.
- Phase 1: 142 MW facility hall, racks energized only as contracted SMR and grid supply lands.
- Phase 2: 142 MW facility hall, gated on Phase 1 supply performance and published noise and traffic compliance.
- Phase 3: 142 MW facility hall, gated on continued SMR delivery milestones and community-score reporting.
- Phase 4: 142 MW facility hall, gated on grid-draw compliance within the agreed headroom share.
- Phase 5: 142 MW facility hall, gated on heat-reuse or water-offset agreement delivery.
- Phase 6: 142 MW facility hall, gated on full supply firmness at the 70% nuclear and 30% grid mix before final energization.
- Local-first hiring for construction trades, tied to the 2,000 construction jobs and 663 permanent jobs in the estimate, with published local hiring and local spend reporting.
- Heat reuse or water offset agreement with the municipality, addressing about 11 million cubic metres of annual water use despite low local water stress.
- Published noise and traffic limits with a named community liaison, regular public reporting against those limits, and a remediation process for breaches.
- Binding ratepayer-protection and disclosure commitments for the 30% grid share, including public reporting of carbon intensity and grid draw.
- Community benefit reporting against the scored community outcome, maintaining a buffer above the 40 floor through construction and into operations.
| Mix | Viable | Score | Payback | IRR | CO₂ kt/yr |
|---|---|---|---|---|---|
| SMR long-term 70% small · 30% grid | yes | 63 | 3.7 yrs | 11% | 896 |
| Renewables + SMR 50% small · 30% solar · 20% wind | no | 64 | 4.4 yrs | 6% | 88 |
| Gas + solar 50% on-site · 50% solar | no | 63 | 4.1 yrs | 8% | 1,297 |
| Hydro PPA + grid 60% hydro · 40% grid | no | 62 | 3.4 yrs | 13% | 1,190 |
| Gas bridge 70% on-site · 30% grid | no | 58 | 3.3 yrs | 14% | 2,692 |
| Solar + wind + grid backup 40% solar · 30% grid · 30% wind | no | 58 | 4.5 yrs | 6% | 848 |
| Grid only 100% grid | no | 55 | 3.4 yrs | 13% | 2,832 |
| Grid + wind 60% grid · 40% wind | no | 55 | 3.8 yrs | 9% | 1,647 |
| As proposed (65% grid · 35% solar) 65% grid · 35% solar | no | 53 | 3.9 yrs | 9% | 1,801 |
| Grid + solar 60% grid · 40% solar | no | 53 | 4.0 yrs | 9% | 1,662 |
Energy what-if
| Metric | This mix | Baseline |
|---|---|---|
| Build cost | $30.9B | $30.9B |
| Months to live | 42 | 42 |
| Blended power | $0.054/kWh | $0.054/kWh |
| Utilization | 61% | 61% |
| EBITDA / yr | $7.9B | $7.9B |
| Payback | 3.9 yrs | 3.9 yrs |
| IRR | 9.2% | 9.2% |
| CO₂ / yr | 1,801,242 t | 1,801,242 t |
| Carbon intensity | 301 g/kWh | 301 g/kWh |
| Water / yr | 10,884,652 m³ | 10,884,652 m³ |
| Grid draw vs headroom | 110% | 110% |
| Land | 767 ha | 767 ha |
| Permanent jobs | 663 | 663 |
| Nuisance index | 46 | 46 |
- Measured open land is 41 ha; the facility and its supply need 767 ha, so land must be assembled beyond the site (sam-3.1).
- Majority of supply is high-carbon; expect scrutiny under disclosure rules.
- Grid draw is 110% of regional headroom; rate impacts for other customers are likely.
Region profile country priors
| Industrial power | $0.075/kWh |
| Grid carbon | 450 g/kWh |
| Interconnect lead | 22 months |
| Grid headroom | 500 MW |
| Grid reliability | 96% |
| Construction trades | 8,000 @ $40/h |
| Land index | 1.10× |
| Sentiment | 56 / 100 |
| Climate · water | temperate · low stress |
| Solar · wind | 0.50 · 0.60 |
| Geothermal · flare gas | no · yes |
| People within 5 km | unknown |
Baseline build cost
Scenarios
| Name | Mix | Score | Payback | Verdict | |
|---|---|---|---|---|---|
| Baseline as reportedbaseline | 65% grid · 35% solar | 53 | 3.9 yrs | Conditional |