Council Bluffs
One of Google's largest campuses, expanded repeatedly since 2007.
Supply as reported: Grid with wind PPAs
The verdict is CONDITIONAL: do not build Council Bluffs as proposed at 70% grid and 30% wind, but it can proceed if the supply mix changes. As proposed it returns 12% IRR, a payback inside 4 years, and $2B of ten-year NPV, yet its environment score of 43 misses the 45 floor and its 77% draw on regional grid headroom breaches the 60% cap. The viable Hydro PPA + grid alternative at 60% hydro and 40% grid lifts the composite to 68, the environment score to 55, and IRR to 13%, while cutting annual emissions from 888 kt to 559 kt. Community strength is not the blocker at 75 as proposed and 81 under hydro, well above the 40 floor, provided land and local commitments are locked in. The condition is therefore specific: switch mixes, assemble the land, and contract the power before committing the full roughly $24B build.
- Adopt the viable Hydro PPA + grid mix at 60% hydro and 40% grid instead of the proposed 70% grid and 30% wind, lifting the environment score from 43 to 55, above the 45 floor, and the composite score from 62 to 68.
- Assemble and secure the full land requirement beyond the 3 ha of measured open land before land close, with the hydro configuration needing 93 ha in total.
- Contract the hydro PPA and confirm grid capacity for only the reduced grid share before construction, so the project no longer relies on a 77% draw on regional headroom above the 60% floor.
- Lock in the community commitments below and maintain a community score well above the 40 floor, consistent with 81 under the hydro alternative versus 75 as proposed.
- Only 3 ha of open land is measured on site, while even the hydro configuration needs 93 ha, so failure to assemble surrounding land stops the project or forces a redesign.
- Grid dependence remains material at 40% under the hydro mix, and the original design's likely rate impacts for other customers could still drive regulatory delay or political opposition.
- If the hydro PPA is delayed or not firm, the project could slip back toward grid-heavy supply, breaching the environment and grid-headroom floors again.
- Five staggered phases over about 37 months, plus a GPU refresh in year 5 embedded in the economics, expose the roughly $24B capex programme to supply-chain, labour, and technology-cycle slippage.
- Annual emissions remain substantial at 559 kt under the preferred alternative and water use is large, so disclosure and community scrutiny will persist despite clearing the floors.
| Supply mix | 60% hydro · 40% grid |
| IT load | 560 MW |
| Hardware | B200 · 80 kW racks |
| Crew · automation | 2,500 · 20% |
| Plan scores | 68 · E 72 · Env 55 · C 81 |
| Live in · payback | 37 mo · 3.4 yrs |
| Clears the floors | yes |
- Permitting, land assembly for 93 ha, and community agreement before land close — gated by signed control of land beyond the 3 ha measured open parcel.
- Hydro PPA execution and grid interconnection confirmation in parallel with civil works — gated by contracted 60% hydro supply and agreed 40% grid draw.
- Phase 1: 132 MW hall built and racks energized only as contracted supply lands — gated by power readiness and commissioning sign-off.
- Phase 2: 132 MW hall — gated by Phase 1 performance, supply delivery, and community noise and traffic compliance.
- Phase 3: 132 MW hall — gated by the same supply, commissioning, and community compliance checks.
- Phase 4: 132 MW hall — gated by the same supply, commissioning, and community compliance checks.
- Phase 5: 132 MW hall to full 560 MW IT load — gated by final supply delivery, commissioning, and a community score review above the 40 floor.
- Local-first hiring for construction trades across the 2,500-person peak crew, with published targets and monthly reporting to the municipality.
- Published noise and traffic limits with a named community liaison, complaint response times, and regular public reporting to keep nuisance low.
- Heat reuse or water offset agreement with the municipality, documented before Phase 1 energization, plus disclosure of water use and mitigation commitments.
- Ongoing local spend and tax transparency, tracking the roughly $121M a year in local spend and roughly $310M a year in tax revenue indicated in the estimate, with an annual community benefits review.
- Community benefits fund and workforce training for the 518 permanent operations roles, prioritising Council Bluffs residents, to sustain sentiment and keep the community score above the 40 floor.
| Mix | Viable | Score | Payback | IRR | CO₂ kt/yr |
|---|---|---|---|---|---|
| Hydro PPA + grid 60% hydro · 40% grid | yes | 68 | 3.4 yrs | 13% | 559 |
| SMR long-term 70% small · 30% grid | yes | 67 | 3.7 yrs | 11% | 417 |
| Gas + solar 50% on-site · 50% solar | yes | 65 | 4.1 yrs | 8% | 1,015 |
| Renewables + SMR 50% small · 30% solar · 20% wind | no | 66 | 4.2 yrs | 8% | 69 |
| Solar + wind + grid backup 40% solar · 30% grid · 30% wind | no | 65 | 4.2 yrs | 7% | 415 |
| Gas bridge 70% on-site · 30% grid | no | 63 | 3.3 yrs | 14% | 1,815 |
| Grid + wind 60% grid · 40% wind | no | 63 | 3.6 yrs | 11% | 764 |
| As proposed (70% grid · 30% wind) 70% grid · 30% wind | no | 62 | 3.5 yrs | 12% | 888 |
| Grid only 100% grid | no | 61 | 3.3 yrs | 14% | 1,273 |
| Grid + solar 60% grid · 40% solar | no | 59 | 3.9 yrs | 9% | 770 |
Energy what-if
| Metric | This mix | Baseline |
|---|---|---|
| Build cost | $23.8B | $23.8B |
| Months to live | 37 | 37 |
| Blended power | $0.047/kWh | $0.047/kWh |
| Utilization | 65% | 65% |
| EBITDA / yr | $6.7B | $6.7B |
| Payback | 3.5 yrs | 3.5 yrs |
| IRR | 11.9% | 11.9% |
| CO₂ / yr | 888,178 t | 888,178 t |
| Carbon intensity | 186 g/kWh | 186 g/kWh |
| Water / yr | 8,987,374 m³ | 8,987,374 m³ |
| Grid draw vs headroom | 77% | 77% |
| Land | 168 ha | 168 ha |
| Permanent jobs | 518 | 518 |
| Nuisance index | 35 | 35 |
- Measured open land is 3 ha; the facility and its supply need 168 ha, so land must be assembled beyond the site (sam-3.1).
- Grid draw is 77% of regional headroom; rate impacts for other customers are likely.
Region profile country priors
| Industrial power | $0.060/kWh |
| Grid carbon | 260 g/kWh |
| Interconnect lead | 18 months |
| Grid headroom | 600 MW |
| Grid reliability | 96% |
| Construction trades | 5,000 @ $38/h |
| Land index | 0.80× |
| Sentiment | 60 / 100 |
| Climate · water | temperate · low stress |
| Solar · wind | 0.60 · 0.95 |
| Geothermal · flare gas | no · yes |
| People within 5 km | unknown |
Baseline build cost
Scenarios
| Name | Mix | Score | Payback | Verdict | |
|---|---|---|---|---|---|
| Baseline as reportedbaseline | 70% grid · 30% wind | 62 | 3.5 yrs | Conditional |